Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1384915.015
Citation: 01003
Citation Type: Serious
Abatement Date: 08/07/2019 2
Initial Penalty: $7,577.00
Current Penalty: $5,000.00
Issuance Date: 06/20/2019
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 5
Report ID: 0521700
Contest Date:
Final Order: 08/20/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/20/2019 | $5,000.00 | 08/07/2019 | Serious | |
Penalty | Z: Issued | 06/20/2019 | $7,577.00 | 08/07/2019 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1910.147(c)(6)(i): The employer failed to conduct an annual periodic inspection of the energy control procedure. a) Co-Mail Department - On or about March 13, 2019, the employer failed to ensure employees who perform service and/or maintenance on equipment for Lines 2, 3 and 4 participated in an annual periodic inspection of the energy control procedure. Employees were thereby exposed to the unexpected energization and/or startup of the equipment.