Violation Detail
Standard Cited: 19260651 K01 Specific Excavation Requirements.
Inspection Nr: 1607384.015
Citation: 01003
Citation Type: Other
Abatement Date: 01/20/2023 2
Initial Penalty: $5,801.00
Current Penalty: $3,770.65
Issuance Date: 01/09/2023
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): I
Gravity: 10
Report ID: 0830500
Contest Date: 02/01/2023
Final Order: 07/27/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/27/2023 | $3,770.65 | 01/20/2023 | Other | |
Penalty | C: Contested | 02/04/2023 | $5,801.00 | 01/20/2023 | Serious | |
Penalty | Z: Issued | 01/09/2023 | $5,801.00 | 01/20/2023 | Serious |
Text For Citation: 01 Item/Group: 003 Hazard:
29 CFR 1926.651(k)(1): Daily inspections of excavations, the adjacent areas, and protective systems were not made by a competent person for evidence of a situation that could have resulted in possible cave-ins, indications of failure of protective systems, hazardous atmospheres, or other hazardous conditions: (a) Breakthrough Resource Management, 8355 E 32nd Ave., Denver, CO 80238, Solana at Central Park Project: On July 12, 2022, and at times prior, the competent person on-site did not conduct an inspection to recognize unsafe conditions in a trench and allowed workers to enter and work in the trench without protective systems. This exposed workers to cave-in hazards.