Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1385578.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 09/30/2019
Initial Penalty: $13,260.00
Current Penalty: $13,260.00
Issuance Date: 09/13/2019
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): A
Gravity: 10
Report ID: 0419400
Contest Date: 10/07/2019
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 11/25/2019 | $13,260.00 | 09/30/2019 | Serious | |
Penalty | Z: Issued | 09/13/2019 | $13,260.00 | 09/30/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.147(c)(4)(ii)(B): Specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy had not been put into place. (a) Department 126, Poletype Division, Regulator Tank Shop, Leak Test and Repair - On or about March 15, 2019, the employer did not ensure that the lockout procedures for the leak test device identify, or explain how and where to isolate or block the gravitational energy of the platform.