Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1426306.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 10/08/2019 2
Initial Penalty: $10,229.00
Current Penalty: $10,229.00
Issuance Date: 09/30/2019
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 10/21/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/21/2019 | $10,229.00 | 10/08/2019 | Serious | |
Penalty | Z: Issued | 09/30/2019 | $10,229.00 | 10/08/2019 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) (a) Moundsville Middle School Field House - On or about 8/22/19, Employees were performing bricklaying from a fabricated frame scaffold which was not fully decked, exposing employees to fall hazards.