Violation Detail
Standard Cited: 19100107 B05 I Spray finishing using flammable and combustible materials.
Inspection Nr: 1749202.015
Citation: 01003A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $8,067.00
Current Penalty: $4,033.50
Issuance Date: 09/05/2024
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0521100
Contest Date:
Final Order: 09/30/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/30/2024 | $4,033.50 | Serious | ||
Penalty | Z: Issued | 09/05/2024 | $8,067.00 | Serious |
Text For Citation: 01 Item/Group: 003A Hazard:
29 CFR 1910.107(b)(5)(i): The spraying operations except electrostatic spraying operations shall be so designed, installed and maintained that the average air velocity over the open face of the booth (or booth cross section during spraying operations) shall be not less than 100 linear feet per minute. Visible gauges or audible alarm or pressure activated devices shall be installed to indicate or insure that the required air velocity is maintained. Filter rolls shall be inspected to insure proper replacement of filter media: On or about May 21, 2024, at a facility located at 811 S. Neenah Avenue in Sturgeon Bay, WI; the employer did not ensure visible gauges, audible alarm or pressure activated devices were installed to insure that the required air velocity was maintained. A manometer was installed on the painting spray booth but it had not been maintained and did not have liquid present to indicate that the required air velocity of the spray booth was being maintained.