Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1102514.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,500.00
Current Penalty: $4,000.00
Issuance Date: 04/28/2016
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0317700
Contest Date: 05/18/2016
Final Order: 06/30/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/30/2017 | $4,000.00 | Serious | ||
Penalty | C: Contested | 05/23/2016 | $4,500.00 | Serious | ||
Penalty | Z: Issued | 04/28/2016 | $4,500.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle(s): a) US GreenFiber, Production Line 2 (Reynolds), Bagging Area: Employees were exposed to a crushing hazard in that the point of operation of the Reynolds Engineering HydraPak hydraulic press (right) was not fully guarded, as discovered on or about 12/09/2016. ABATED DURING INSPECTION NO ABATEMENT CERTIFICATION REQUIRED