Violation Detail
Standard Cited: 19260451 G04 I General requirements.
Inspection Nr: 1430748.015
Citation: 01004
Citation Type: Serious
Abatement Date: 03/02/2020 2
Initial Penalty: $9,446.00
Current Penalty: $5,398.00
Issuance Date: 02/13/2020
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 03/12/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/12/2020 | $5,398.00 | 03/02/2020 | Serious | |
Penalty | Z: Issued | 02/13/2020 | $9,446.00 | 03/02/2020 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(g)(4)(i): Guardrail systems were not installed along open sides and ends of platforms: a) On or about September 11, 2019, at the northeast side of the construction site, employees utilized a scaffold approximately 15-feet above the ground without installing guardrail systems along open sides and ends of platforms while performing masonry work.