Violation Detail
Standard Cited: 19260451 D12 VI General requirements.
Inspection Nr: 1456644.015
Citation: 01004
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $9,639.00
Current Penalty: $9,639.00
Issuance Date: 06/18/2020
Nr Instances: 4
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0936300
Contest Date:
Final Order: 07/17/2020
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 06/18/2020 | $9,639.00 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1926.451(d)(12)(vi): When U-bolt clips are used, the U-bolt shall be placed over the dead end of the rope, and the saddle shall be placed over the live end of the rope. January 10, 2010 on the fourth floor south tower: The U section of U-bolt wire rope clips used as part of the system to support the scaffolding were not installed in contact with the dead end and the saddle on the live end of the rope. Employees were exposed to fall hazards.