Violation Detail
Standard Cited: 19100147 F01 V The control of hazardous energy (lockout/tagout).
Inspection Nr: 1515052.015
Citation: 01004
Citation Type: Serious
Abatement Date: 06/04/2021 2
Initial Penalty: $9,557.00
Current Penalty: $5,734.20
Issuance Date: 04/30/2021
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 05/21/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/21/2021 | $5,734.20 | 06/04/2021 | Serious | |
Penalty | Z: Issued | 04/30/2021 | $9,557.00 | 06/04/2021 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.147(f)(1) Testing or positioning of machines, equipment or components thereof. In situations in which lockout or tagout devices must be temporarily removed from the energy isolating device and the machine or equipment energized to test or position the machine, equipment or component thereof, the following sequence of actions shall be followed: 29 CFR 1910.147(f)(1)(v): Deenergize all systems and reapply energy control measures in accordance with paragraph (d) of this section to continue the servicing and/or maintenance. a. On or about February 9, 2021, in the Soap Pad Department, the employer did not ensure that employees who were performing testing of the North Conveyor chain and sprocket deenergized and applied a lockout device to the equipment prior to continuing the servicing and maintenance tasks.