Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1524024.015
Citation: 01004
Citation Type: Serious
Abatement Date: 11/12/2021
Initial Penalty: $13,653.00
Current Penalty: $13,653.00
Issuance Date: 10/06/2021
Nr Instances: 6
Nr Exposed: 68
Related Event Code (REC):
Gravity: 10
Report ID: 0522500
Contest Date: 10/25/2021
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 10/29/2021 | $13,653.00 | 11/12/2021 | Serious | |
Penalty | Z: Issued | 10/06/2021 | $13,653.00 | 11/12/2021 | Serious |
Text For Citation: 01 Item/Group: 004 Hazard:
29 CFR 1910.119(d)(3)(i): Information pertaining to the technology of the process did not include the following:. 29 CFR 1910.119(d)(3)(i)(B):Piping and instrument diagrams (P&ID's); a. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) did not include the manway opening into the kettle 3 reactor vessel (drawing name RP-KT03). b. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) lacked detail regarding the internal cooling water coils for kettle 3 reactor vessel (drawing name RP-KT03). The drawing failed to include the number of "turns," thickness of pipe, diameter of pipe and approximate square footage for the internal cooling water coils. c. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) did not include the kettle 3 reactor vessel relief system rupture disk set point (drawing name RP-KT03). d. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) did not include the kettle 4 reactor vessel relief system rupture disk set point (drawing name RP-KT04). e. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) did not include the kettle 5 reactor vessel relief system rupture disk set point (drawing name RP-KT05). f. On or about and prior to April 8, 2021, the employer's piping and instrument diagrams (P&ID's) did not include the kettle 8 reactor vessel relief system rupture disk set point (drawing name RP-KT08).