Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1068057.015
Citation: 01004B
Citation Type: Serious
Abatement Date: 08/05/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/10/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 1
Report ID: 0317500
Contest Date:
Final Order: 07/30/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/30/2015 | $0.00 | 08/05/2015 | Serious | |
Penalty | Z: Issued | 07/10/2015 | $0.00 | 08/05/2015 | Serious |
Text For Citation: 01 Item/Group: 004B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: (a) Facility, 1406 Perry Highway, Portersville, PA: On or about 06/04/15 the employer did not conduct a period inspection, at least annually, of the energy control procedures to ensure the requirements of the standard were being followed. NOTE: The employer should complete a certification record that would identify the machine or equipment on which the control procedure was utilized, the date of inspection, the employees included in the inspection and the name of the person performing the inspection.