Violation Detail
Standard Cited: 19100147 C07 IV The control of hazardous energy (lockout/tagout).
Inspection Nr: 1068057.015
Citation: 01004C
Citation Type: Serious
Abatement Date: 08/05/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/10/2015
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 1
Report ID: 0317500
Contest Date:
Final Order: 07/30/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/30/2015 | $0.00 | 08/05/2015 | Serious | |
Penalty | Z: Issued | 07/10/2015 | $0.00 | 08/05/2015 | Serious |
Text For Citation: 01 Item/Group: 004C Hazard:
29 CFR 1910.147(c)(7)(iv): The employer did not certify that employee training had been accomplished and kept up to date: (a) Facility, 1406 Perry Highway, Portersville, PA: On or about 06/04/15 the employer had not certified that employee training had been conducted on the purpose and function of the energy control program. NOTE: The certification shall contain each employee's name and dates of training.