Violation Detail
Standard Cited: 19100147 D The control of hazardous energy (lockout/tagout).
Inspection Nr: 1151844.015
Citation: 01004D
Citation Type: Serious
Abatement Date: 05/01/2017 2
Initial Penalty: $12,471.00
Current Penalty: $0.00
Issuance Date: 10/31/2016
Nr Instances: 7
Nr Exposed: 20
Related Event Code (REC): C
Gravity: 10
Report ID: 0522000
Contest Date: 11/16/2016
Final Order: 05/10/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/10/2017 | $0.00 | 05/01/2017 | Serious | |
Penalty | C: Contested | 11/16/2016 | $12,471.00 | 11/28/2016 | Serious | |
Penalty | Z: Issued | 10/31/2016 | $12,471.00 | 11/28/2016 | Serious |
Text For Citation: 01 Item/Group: 004D Hazard:
29 CFR 1910.147(d): The established procedures for the application of energy control (the lockout or tagout procedures) shall cover the following elements and actions and shall be done in the following sequence: (a) Employees who performed servicing on and around the robotic cells on the grinding lines in ARG prior to entering the robotic cells, failed to first: (1) turn off and shut down the machine, (2) physically locate and operate energy isolating devices in such a manner as to isolate the machine or equipment from the energy source, (3) affix lockout or tagout devices to each energy isolating device. (b) Employees who changed the belts on the grinders on the grinding lines in ARG, failed to first: (1) turn off and shut down the machine, (2) physically locate and operate energy isolating devices in such a manner as to isolate the machine or equipment from the energy source, (3) affix lockout or tagout devices to each energy isolating device. (c) Employees who setup the injection molding machines in the PVC Encapsulation Room prior to entering the injection molding machines, failed to first: (1) turn off and shut down the machine, (2) physically locate and operate energy isolating devices in such a manner as to isolate the machine or equipment from the energy source, (3) affix lockout or tagout devices to each energy isolating device. (d) On or about June 26, 2016, an employee who removed a guard covering the running chain and sprocket on the FBT 1 Tempering Furnace Line in order to oil the chain, failed to first: (1) turn off and shut down the machine, (2) physically locate and operate energy isolating devices in such a manner as to isolate the machine or equipment from the energy source, (3) affix lockout or tagout devices to each energy isolating device.