Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1113807.015
Citation: 01005
Citation Type: Serious
Abatement Date: 12/31/2017 2
Initial Penalty: $3,150.00
Current Penalty: $3,150.00
Issuance Date: 06/17/2016
Nr Instances: 2
Nr Exposed: 33
Related Event Code (REC):
Gravity: 5
Report ID: 0522500
Contest Date: 07/07/2016
Final Order: 01/17/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/17/2018 | $3,150.00 | 12/31/2017 | Serious | |
Penalty | C: Contested | 07/11/2016 | $3,150.00 | 08/04/2016 | Serious | |
Penalty | Z: Issued | 06/17/2016 | $3,150.00 | 08/04/2016 | Serious |
Text For Citation: 01 Item/Group: 005 Hazard:
29 CFR 1910.119(d)(3)(i): Process safety information. Information pertaining to the equipment in the process shall include: 29 CFR 1910.119(d)(3)(i)(B): Piping and instrument diagrams (P&ID's): a. On December 21, 2015, and at times prior, the employer's Piping & Instrumentation Diagram Phytosterol Melt Tank, PDD 400 (updated July 30, 2015), was not accurate in that the three inch relief piping after the rupture disc on the TK 0401-00 Melt Tank did not vent to the ground. b. As of December 21, 2015, the employer failed to develop a P&ID which covered the fatty acid methyl ester (FAME) recovery process, including the following equipment: TK 0405-00 FAME Recovery Tank, AG 0405-01 FAME Recovery Tank Agitator, E 0408-00 FAME Recovery Condenser, Condensate Trap Condenser (unknown tank identifier); TK 0406-00 FAME Condensate Receiver, and FA 0410-01 Flame Arrestor.