Violation Detail
Standard Cited: 19261101 G08 II A Asbestos
This violation item has been deleted.
Inspection Nr: 1328349.015
Citation: 01005A
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,467.00
Current Penalty: $0.00
Issuance Date: 11/01/2018
Nr Instances: 1
Nr Exposed: 6
Related Event Code (REC):
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 11/27/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/27/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 11/01/2018 | $6,467.00 | Serious |
Text For Citation: 01 Item/Group: 005A Hazard:
29 CFR 1926.1101(g)(8)(ii)(A): Roofing material shall be removed in an intact state to the extent feasible. The Controlling Employer did not ensure that asbestos-containing shingles were removed in an intact state in that on June 14, 2018, subcontractor employees were using hammers and shovels to break up shingles for removal. Bulk samples revealed the shingles contained 10.38% chrysotile asbestos and the mastic 14.25% chrysotile asbestos.