Violation Detail
Standard Cited: 19100217 E01 I A Mechanical power presses.
Inspection Nr: 1217876.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 07/17/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/30/2017
Nr Instances: 4
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 07/07/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/07/2017 | $0.00 | 07/17/2017 | Serious | |
Penalty | Z: Issued | 05/30/2017 | $0.00 | 07/17/2017 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.217(e)(1)(i)(A): The employer did not conduct periodic and regular inspections of each power press to ensure that all of its parts, auxiliary equipment, and safeguards, including the clutch/brake mechanism, antirepeat feature, and single-stroke mechanism, were in a safe operating condition and adjustment: Broach Department, Press Area: On, or about, April 28, 2017, the company had not developed and implemented a program of periodic, documented, inspections of mechanical power presses.