Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1285115.015
Citation: 01005B
Citation Type: Serious
Abatement Date: 05/25/2018 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/01/2018
Nr Instances: 10
Nr Exposed: 20
Related Event Code (REC):
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 06/04/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/04/2018 | $0.00 | 05/25/2018 | Serious | |
Penalty | Z: Issued | 05/01/2018 | $0.00 | 05/25/2018 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct an annual or more frequent inspection of the energy control procedure to ensure that the procedure and requirements of this standard were followed: At this oil waste treatment and disposal facility, inspections of the energy control procedures were not conducted at least annually for the following types of machines: a. Offload Bay 1, 2, 3, 4 and 5 (Pump Systems MCM); b. Charge Pump 1, 2 and 3 (Pump System MCM); c. Injection Pump 1 and 2 (Pump System Borretts); d. Oil transfer Pump (Pump System TITAN 3); e. Containment Sump (Pump System TITAN 4); f. SPF Assets (Pump System Gormann Rupp); g. Main Transfer pump (Pump System RUFF); h. Secondary Transfer Pump (Pump System Vaughn); i. Triplex Transfer Pump (Pump System TSC), and; j. Vacuum Unload System (Vaughn).