Violation Detail
Standard Cited: 19100119 F01 ID Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 315723312
Citation: 01005B
Citation Type: Serious
Abatement Date: 06/04/2012
Initial Penalty:
Current Penalty:
Issuance Date: 05/01/2012
Nr Instances: 1
Nr Exposed: 40
Related Event Code (REC): R
Gravity: 10
Report ID: 0626700
Contest Date: 05/25/2012
Final Order: 02/15/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 02/15/2013 | 06/04/2012 | Serious | ||
Penalty | Z: Issued | 05/01/2012 | 06/04/2012 | Serious |
Text For Citation: 01 Item/Group: 005B Hazard: CHEMNEP
29 CFR 1910.119(f)(1)(i)(D): The employer's written operating procedures covering the steps for each operating phase did not address emergency shutdown including the conditions under which emergency shutdown is required, and the assignment of shutdown responsibility to qualified operators to ensure that emergency shutdown is executed in a safe and timely manner: a)This condition was most recently observed, at E. I. du Pont de Nemours and Company, in Beaumont, TX, in the Aniline Unit where the employer did not ensure that the operator on CCR#1 had emergency shutdown procedures to ensure that the responsibility of an emergency shutdown was executed in a safe and timely manner, during the incident on November 3, 2011.ber