Violation Detail
Standard Cited: 19100179 M01 Overhead and gantry cranes.
Inspection Nr: 1068057.015
Citation: 01005D
Citation Type: Serious
Abatement Date: 08/26/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/10/2015
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): C
Gravity: 5
Report ID: 0317500
Contest Date:
Final Order: 07/30/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/30/2015 | $0.00 | 08/26/2015 | Serious | |
Penalty | Z: Issued | 07/10/2015 | $0.00 | 08/26/2015 | Serious |
Text For Citation: 01 Item/Group: 005D Hazard:
29 CFR 1910.179(m)(1): Thorough monthly inspections of rope conditions, with written, dated and signed reports, were not performed on the running ropes: (a) Facility, 1406 Perry Highway, Portersville, PA: On or about 06/04/15 the employer did not conduct monthly inspections of rope conditions, with written, dated and signed reports for the 4 overhead cranes used in the facility.