Violation Detail
Standard Cited: 19100119 D03 I D Process safety management of highly hazardous chemicals.
Inspection Nr: 1344954.015
Citation: 01007
Citation Type: Serious
Abatement Date: 10/31/2019 2
Initial Penalty: $9,500.00
Current Penalty: $9,500.00
Issuance Date: 01/23/2019
Nr Instances: 1
Nr Exposed: 12
Related Event Code (REC):
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 02/05/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/05/2019 | $9,500.00 | 10/31/2019 | Serious | |
Penalty | Z: Issued | 01/23/2019 | $9,500.00 | 03/07/2019 | Serious |
Text For Citation: 01 Item/Group: 007 Hazard:
29 CFR 1910.119(d)(3)(i)(D): The employer did not include, in the process safety information compilation, the relief system design and the design basis. Pressure relief system to be in accordance with recognized and accepted good engineering practices to include the design, design basis, calculations and assumptions compiled for reference.