Violation Detail
Standard Cited: 19100212 A01 General requirements for all machines.
Inspection Nr: 1560825.015
Citation: 01008
Citation Type: Serious
Abatement Date: 03/29/2022 2
Initial Penalty: $14,357.00
Current Penalty: $7,178.00
Issuance Date: 03/22/2022
Nr Instances: 3
Nr Exposed: 32
Related Event Code (REC):
Gravity: 10
Report ID: 0524700
Contest Date:
Final Order: 04/21/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/21/2022 | $7,178.00 | 03/29/2022 | Serious | |
Penalty | Z: Issued | 03/22/2022 | $14,357.00 | 03/29/2022 | Serious |
Text For Citation: 01 Item/Group: 008 Hazard:
29 CFR 1910.212(a)(1):One or more methods of machine guarding was not provided to protect the operator and other employees in the machine area from hazards such as those created by point of operation, ingoing nip points, rotating parts, flying chips and sparks: a. Pinnacle Industrial Enterprises, Inc. - Bowling Green, Ohio: On or about November 3, 2021, employees were not protected from crushing injuries in that the pinch point created by the two platens of Press 1 were not adequately guarded. Employees enter the press to pre-apply parts that are incorporated into the final mold and to retrieve dropped plastic debris. b. Pinnacle Industrial Enterprises, Inc. - Bowling Green, Ohio: On or about November 3, 2021, employees were not protected from crushing injuries in that the pinch point created by the two platens of Press 3 were not adequately guarded. Employees enter the press to pre-apply parts that are incorporated into the final mold and to retrieve dropped plastic debris. c. Pinnacle Industrial Enterprises, Inc. - Bowling Green, Ohio: On or about November 3, 2021, employees were not protected from crushing injuries in that the pinch point created by the two platens of Press 9 were not adequately guarded. Employees enter the press to receive parts which were not automatically removed and to retrieve dropped plastic debris. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence, or written records.