Violation Detail
Standard Cited: 19100179 N02 I Overhead and gantry cranes.
Inspection Nr: 961334.015
Citation: 01009
Citation Type: Serious
Abatement Date: 08/30/2014 2
Initial Penalty: $5,000.00
Current Penalty: $3,500.00
Issuance Date: 07/30/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 08/21/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2014 | $3,500.00 | 08/30/2014 | Serious | |
Penalty | Z: Issued | 07/30/2014 | $5,000.00 | 08/30/2014 | Serious |
Text For Citation: 01 Item/Group: 009 Hazard:
29 CFR 1910.179(n)(2)(i): Hoist chain(s) or hoist rope(s) were not free from kinks or twists: a) On or about 03/05/14, in the Coke Handling Area, the hoist rope of overhead crane #1 DD used to lift heavy metal materials (i.e. Steel screens) was not free from kinks. ABATEMENT DOCUMENTATION REQUIRED