Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
Inspection Nr: 1139490.015
Citation: 01009A
Citation Type: Serious
Abatement Date: 10/07/2016 2
Initial Penalty: $12,471.00
Current Penalty: $8,250.00
Issuance Date: 09/01/2016
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): C
Gravity: 10
Report ID: 0134000
Contest Date:
Final Order: 09/27/2016
Emphasis:
Substance: 1040
Substance: 2460
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2016 | $8,250.00 | 10/07/2016 | Serious | |
Penalty | Z: Issued | 09/01/2016 | $12,471.00 | 10/07/2016 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.119(j)(2): The employer did not establish written procedures to maintain the on-going integrity of process equipment: (a) Location - 1400 Middlesex Street, Lowell, MA: On or about 6/24/2016, written procedures to maintain the mechanical integrity of the equipment involved in the tape manufacturing process have not been developed.