Violation Detail
Standard Cited: 19100335 A01 II Safeguards for personnel protection.
Inspection Nr: 1119628.015
Citation: 01010B
Citation Type: Serious
Abatement Date: 05/02/2016 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/16/2016
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 04/06/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/06/2016 | $0.00 | 05/02/2016 | Serious | |
Penalty | Z: Issued | 03/16/2016 | $0.00 | 05/02/2016 | Serious |
Text For Citation: 01 Item/Group: 010B Hazard:
29 CFR 1910.335(a)(1)(ii): Protective equipment was not maintained in a safe, reliable condition and/or was not periodically inspected or tested: Plant: On, or about, January 15, 2016, a pair of Salisbury Class 0 voltage rated gloves had not been inspected every six months.