Violation Detail
Standard Cited: 19100305 J02 IV Wiring methods, components, and equipment for general use.
Inspection Nr: 1138055.015
Citation: 01012
Citation Type: Serious
Abatement Date: 08/26/2016 2
Initial Penalty: $4,950.00
Current Penalty: $4,950.00
Issuance Date: 07/29/2016
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC): C
Gravity: 5
Report ID: 0636900
Contest Date:
Final Order: 07/29/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 07/29/2016 | $4,950.00 | 08/26/2016 | Serious | |
Penalty | I: Informal Settlement | 07/29/2016 | $4,950.00 | 08/26/2016 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.305(j)(2)(iv): A receptacle installed in a wet or damp location was not suitable for the location: At the facility on the west side of building 5, employees used receptacle gang boxes that were exposed to rain and not protected by a ground fault circuit interrupter nor suitable for the wet locations exposing employees to electrical shock hazards.