Violation Detail
Standard Cited: 19100334 A02 I Use of equipment.
Inspection Nr: 1602751.015
Citation: 01012
Citation Type: Serious
Abatement Date: 01/12/2023 2
Initial Penalty: $7,458.00
Current Penalty: $4,475.00
Issuance Date: 12/15/2022
Nr Instances: 9
Nr Exposed: 120
Related Event Code (REC): C
Gravity: 5
Report ID: 0625400
Contest Date:
Final Order: 01/13/2023
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/13/2023 | $4,475.00 | 01/12/2023 | Serious | |
Penalty | Z: Issued | 12/15/2022 | $7,458.00 | 01/12/2023 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.334(a)(2)(i): Portable cord and plug connected equipment and flexible cord sets (extension cords) were not visually inspected before use on any shift for external defects (such as loose parts, deformed and missing pins, or damage to outer jacket or insulation) and for evidence of possible internal damage (such as pinched or crushed outer jacket): On or about June 15, 2022, and at times prior thereto, employees were using multiple energized 120-Volt extension cords running across highly trafficked walking-working surfaces to power industrial fans without inspecting the cords before use, exposing the employees to an electrical shock hazard. a) The main entrance to the Production Floor from the lobby had at least 3 extension cords on the floor. b) The Press Machine Area had multiple extension cords. c) The Laser Machine Area had multiple extension cords on the floor. d) The Assembly Machine(s) Area had multiple extension cords on the floor. e) The CMC Room had multiple extension cords on the floor. f) The Center walkway had multiple extension cords on the walkway. g) The main floor walkway on the right of the forklift aisle had multiple extension cords. h) The Loading Dock Area had multiple extension cords on the floor. i) The Press Panel Mezzanine had multiple extension cords on the walkway.