Violation Detail
Standard Cited: 19100304 F01 IV Wiring design and protection.
Inspection Nr: 1745509.015
Citation: 01012
Citation Type: Serious
Abatement Date: 09/13/2024
Initial Penalty: $3,687.00
Current Penalty: $3,687.00
Issuance Date: 09/03/2024
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC): R
Gravity: 5
Report ID: 0215600
Contest Date: 09/27/2024
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 09/27/2024 | $3,687.00 | 09/13/2024 | Serious | |
Penalty | Z: Issued | 09/03/2024 | $3,687.00 | 09/13/2024 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.304(f)(1)(iv): Overcurrent devices for circuits rated 600 volts, nominal, or less, were not readily accessible to each employee or authorized building management personnel: Hothead Grabba- 103-27 99th Street, Ozone Park, NY 11417 a) Employees were engaged in tobacco manufacturing activities in a warehouse where an electrical panel was blocked by waste materials, preventing access to the electrical panel; on or about 5/2/2024. Note: The employer is required to submit abatement certification for this item in accordance with 29 CFR 1903.19.