Violation Detail
Standard Cited: 19100253 B04 III Oxygen-fuel gas welding and cutting.
Inspection Nr: 961334.015
Citation: 01012
Citation Type: Serious
Abatement Date: 1
Initial Penalty: $5,100.00
Current Penalty: $3,570.00
Issuance Date: 07/30/2014
Nr Instances: 1
Nr Exposed: 13
Related Event Code (REC):
Gravity: 5
Report ID: 0213600
Contest Date:
Final Order: 08/21/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2014 | $3,570.00 | Serious | ||
Penalty | Z: Issued | 07/30/2014 | $5,100.00 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.253(b)(4)(iii): Oxygen cylinders in storage were not separated from fuel-gas cylinders, a minimum distance of 20 feet (6.1 m) or by a noncombustible barrier at least 5 feet (1.5 m) high having a fire-resistance rating of at least one-half hour: a) On or about 03/05/14, in the Boiler House Building, Oxygen cylinders were stored three feet away from Acetylene cylinders. NO ABATEMENT CERTIFICATION REQUIRED