Violation Detail
Standard Cited: 19100269 D06 VII Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 900009.015
Citation: 01014B
Citation Type: Serious
Abatement Date: 11/06/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/24/2013
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date: 11/04/2013
Final Order: 12/05/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/05/2014 | $0.00 | 11/06/2013 | Serious | |
Penalty | C: Contested | 12/30/2013 | $0.00 | 11/06/2013 | Serious | |
Penalty | Z: Issued | 09/24/2013 | $0.00 | 11/06/2013 | Serious |
Text For Citation: 01 Item/Group: 014B Hazard:
29 CFR 1910.269(d)(6)(vii): Before starting work on machines or equipment that have been locked out or tagged out, the authorized employee did not verify that isolation and deenergizing of the machine or equipment had been accomplished: a. Unit 2 equipment - After purging hydrogen gas from the #2 generator, the employer did not verify that isolation from the hydrogen supply had been achieved by removing a supply pig tail, spool piece or other supply disconnects.