Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
This violation item has been deleted.
Inspection Nr: 1020632.015
Citation: 01015
Citation Type: Serious
Abatement Date: 06/29/2015
Initial Penalty: $2,550.00
Current Penalty: $0.00
Issuance Date: 06/03/2015
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC):
Gravity: 1
Report ID: 0936200
Contest Date: 06/26/2015
Final Order: 03/08/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/08/2016 | $0.00 | 06/29/2015 | Serious | |
Penalty | C: Contested | 07/02/2015 | $2,550.00 | 06/29/2015 | Serious | |
Penalty | Z: Issued | 06/03/2015 | $2,550.00 | 06/29/2015 | Serious |
Text For Citation: 01 Item/Group: 015 Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces: CWC 113, Material Expeditors bldg. 615: Employees exposed to electrical hazards where an extension cord was draped over structural supports on the walls of the building.