Violation Detail
Standard Cited: 19100269 D07 IV Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 900009.015
Citation: 01015
Citation Type: Serious
Abatement Date: 10/24/2013 2
Initial Penalty: $7,000.00
Current Penalty: $7,000.00
Issuance Date: 09/24/2013
Nr Instances: 1
Nr Exposed: 9
Related Event Code (REC):
Gravity: 10
Report ID: 0418200
Contest Date: 11/04/2013
Final Order: 12/05/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/05/2014 | $7,000.00 | 10/24/2013 | Serious | |
Penalty | C: Contested | 12/30/2013 | $7,000.00 | 10/24/2013 | Serious | |
Penalty | Z: Issued | 09/24/2013 | $7,000.00 | 10/24/2013 | Serious |
Text For Citation: 01 Item/Group: 015 Hazard:
29 CFR 1910.269(d)(7)(iv): Each lockout or tagout device was not removed from each energy isolating device by the authorized employee who applied the lockout or tagout device: a. Unit 2 Generator - Boiler Turbine Operators ("BTO") were allowed to remove maintenance hold tags that were applied by other BTOs, without first attempting to contact the applying BTO when the applying BTO was still on site.