Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1058109.015
Citation: 01021
Citation Type: Serious
Abatement Date: 10/19/2015 2
Initial Penalty: $3,300.00
Current Penalty: $1,980.00
Issuance Date: 10/08/2015
Nr Instances: 2
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0111100
Contest Date:
Final Order: 11/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/02/2015 | $1,980.00 | 10/19/2015 | Serious | |
Penalty | Z: Issued | 10/08/2015 | $3,300.00 | 10/19/2015 | Serious |
Text For Citation: 01 Item/Group: 021 Hazard:
29 CFR 1910.303(b)(2): Listed or labeled electrical equipment was not used or installed in accordance with instructions included in the listing or labeling: Electrical equipment were not used or installed in accordance with instructions included in the listing or labeling in the following instances: a) C2 Coater Drive Substation - The door on the energized Jagenberg Control Power Master Cabinet MP#1 was not closed. b) Butler Building, Hazmat Storage Area - A relocatable power tap was supplying power to an extension cord and relocatable power tap.