Violation Detail
Standard Cited: 19100303 G02 I General.
Inspection Nr: 1058109.015
Citation: 01025A
Citation Type: Serious
Abatement Date: 10/15/2015 2
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 10/08/2015
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 11/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/02/2015 | $4,200.00 | 10/15/2015 | Serious | |
Penalty | Z: Issued | 10/08/2015 | $7,000.00 | 10/15/2015 | Serious |
Text For Citation: 01 Item/Group: 025A Hazard:
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): Live parts of electric equipment were not guarded in the following instances: a) #9-1 Substation - The cover to the #8 PM Saveall Drive cabinet was removed exposing the 110 volt circuitry. b) Receiving Lighting Panel #4 - The missing cover to the busbar exposed one of the 110 volt legs.