Violation Detail
Standard Cited: 19100305 J01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1058109.015
Citation: 01025B
Citation Type: Serious
Abatement Date: 10/19/2015 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/08/2015
Nr Instances: 4
Nr Exposed: 10
Related Event Code (REC):
Gravity: 10
Report ID: 0111100
Contest Date:
Final Order: 11/02/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/02/2015 | $0.00 | 10/19/2015 | Serious | |
Penalty | Z: Issued | 10/08/2015 | $0.00 | 10/19/2015 | Serious |
Text For Citation: 01 Item/Group: 025B Hazard:
29 CFR 1910.305(j)(1)(i): Live parts of receptacles were exposed to employee contact: Live parts were exposed to employee contact in the following instances: a) Catalog Shipping Dock Area - The cover on the 110 volt receptacle was damaged, and the live parts were exposed. b) Catalog Shipping Dock Area - The cover on the 220 volt receptacle was damaged, and the live parts were exposed. c) #5 Paper Machine Basement - The weather cover or enclosure on the 110 volt receptacle was missing, and the live parts were exposed. d) C-3 Reeler Station - The weather cover or enclosure on the 110 volt receptacle was missing, and the live parts were exposed.