Violation Detail
Standard Cited: 19260451 F06 General requirements.
Inspection Nr: 1526028.015
Citation: 02001
Citation Type: Willful
Abatement Date: 3
Initial Penalty: $27,306.00
Current Penalty: $11,000.00
Issuance Date: 09/21/2021
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0214200
Contest Date:
Final Order: 10/18/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 10/18/2021 | $11,000.00 | Willful | ||
Penalty | Z: Issued | 09/21/2021 | $27,306.00 | Willful |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1926.451(f)(6):The clearance between scaffolds and power lines were not as follows: Scaffolds shall not be erected, used, dismantled, altered, or moved such that they or any conductive material handled on them might come closer to exposed and energized power lines than as follows: Uninsulated lines Less than 50 kv shall be a minimum distance of 10 feet (3.1 m) and More than 50 kv a minimum distance of 10 feet (3.1 m) plus 0.4 inches for each 1 kv over and 2 times the length of the line insulator, but never less than 10 feet (3.1 m). Location: 380 Communipaw Ave Jersey City, NJ 07302 a) Employees exposed to electrical shock hazards while performing framing and window installation operations on an Sky Trak HG5L65 aerial lift within 10 feet of uninsulated, energized power lines. Hazard observed on or about 4/20/21.