Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 992896.015
Citation: 02001
Citation Type: Serious
Abatement Date: 03/19/2015 2
Initial Penalty: $38,500.00
Current Penalty: $7,000.00
Issuance Date: 02/26/2015
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0418400
Contest Date: 03/13/2015
Final Order: 01/04/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/04/2016 | $7,000.00 | 03/19/2015 | Serious | |
Penalty | C: Contested | 03/18/2015 | $38,500.00 | 03/19/2015 | Repeat | |
Penalty | Z: Issued | 02/26/2015 | $38,500.00 | 03/19/2015 | Repeat |
Text For Citation: 02 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) The Company's written lockout/tagout procedure for hydraulic valve energy control for Lowerators was not utilized by employees prior to accessing Ramp #2 and Lowerator No. 4.