Violation Detail
Standard Cited: 19100036 B01 Design and construction requirements for exit routes.
Inspection Nr: 1721326.015
Citation: 02001A
Citation Type: Repeat
Abatement Date: 12/31/2024
Initial Penalty: $12,905.00
Current Penalty: $6,467.00
Issuance Date: 07/15/2024
Nr Instances: 1
Nr Exposed: 15
Related Event Code (REC): C
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 08/08/2024
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/08/2024 | $6,467.00 | 12/31/2024 | Repeat | |
Penalty | Z: Issued | 07/15/2024 | $12,905.00 | 08/19/2024 | Repeat |
Text For Citation: 02 Item/Group: 001A Hazard:
29 CFR 1910.36(b)(1): At least two exit routes were not available to permit prompt evacuation of employees during an emergency. Foundry Area: On or about January 17, 2024, at least two exit routes were not available to permit prompt evacuation of employees during an emergency. Due to the size of the room and the type of operation, two or more exits were required for egress. Integra-Cast Incorporated was previously cited for a violation of this occupational safety and health standard, which was contained in OSHA inspection number 1492656, citation number 1, item number 1a, and was affirmed as a final order on March 9, 2021, with respect to a workplace located at 265 Newington Avenue, New Britain, CT 06051.