Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1512132.015
Citation: 02002
Citation Type: Willful
Abatement Date: 09/08/2021
Initial Penalty: $136,532.00
Current Penalty: $136,532.00
Issuance Date: 07/22/2021
Nr Instances: 2
Nr Exposed: 15
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date: 08/13/2021
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 08/24/2021 | $136,532.00 | 09/08/2021 | Willful | |
Penalty | Z: Issued | 07/22/2021 | $136,532.00 | 09/08/2021 | Willful |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section. a - On or about January 28, 2021, at Plant 4, the employer exposed employees to thermal, chemical and mechanical hazards as specific lockout procedures were not developed and documented by authorized employees performing servicing and maintenance on the liquid nitrogen Line 4 Immersion/Spiral freezer. b - On or about January 28, 2021, at Plant 4, the employer exposed employees to thermal, chemical and mechanical hazards as specific lockout procedures were not developed and documented by authorized employees servicing and maintaining the Line 2 Spiral freezer.