Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 624938.015
Citation: 02002
Citation Type: Repeat
Abatement Date: 12/05/2012 2
Initial Penalty: $4,000.00
Current Penalty: $3,000.00
Issuance Date: 12/04/2012
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 12/04/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 12/04/2012 | $4,000.00 | 12/05/2012 | Repeat | |
Penalty | I: Informal Settlement | 12/04/2012 | $3,000.00 | 12/05/2012 | Repeat |
Text For Citation: 02 Item/Group: 002 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii) a) Jobsite - The 2nd and 3rd working levels of the tubular welded scaffold were not fully planked between the front and rear uprights. The working levels contained 2 or 3 planks where employees were performing stucco operations. Observed on or about 09/11/2012 JC CONSTRUCTION WAS PREVIOUSLY CITED FOR THIS OCCUPATIONAL SAFETY AND HEALTH STANDARD WHICH WAS CONTAINED IN OSHA INSPECTION #314232612, CITATION 1 ITEM 3 AND WAS AFFIRMED AS A FINAL ORDER ON MARCH 11, 2011 WITH RESPECT TO THE WORKSITE LOCATED AT 1017 N. 3RD STREET, PHILADELPHIA, PA.