Violation Detail
Standard Cited: 19100305 B01 II Wiring methods, components, and equipment for general use.
Inspection Nr: 1458394.015
Citation: 02006
Citation Type: Serious
Abatement Date: 05/18/2020 2
Initial Penalty: $9,472.00
Current Penalty: $9,472.00
Issuance Date: 05/06/2020
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0953220
Contest Date: 07/24/2020
Final Order: 05/24/2022
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/24/2022 | $9,472.00 | 05/18/2020 | Serious | |
Penalty | C: Contested | 08/11/2020 | $9,472.00 | 05/18/2020 | Serious | |
Penalty | Z: Issued | 05/06/2020 | $9,472.00 | 05/18/2020 | Serious |