Violation Detail
Standard Cited: 19100305 B01 I Wiring methods, components, and equipment for general use.
Inspection Nr: 1174990.015
Citation: 03003A
Citation Type: Other
Abatement Date: 3
Initial Penalty: $7,967.00
Current Penalty: $3,000.00
Issuance Date: 02/27/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity:
Report ID: 0522300
Contest Date:
Final Order: 03/17/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/17/2017 | $3,000.00 | Other | ||
Penalty | Z: Issued | 02/27/2017 | $7,967.00 | Serious |
Text For Citation: 03 Item/Group: 003A Hazard:
29 CFR 1910.305(b)(1)(i): Conductors entering cutout boxes, cabinets, or fittings were not protected from abrasions: On or about September 1, 2016, employees were exposed to live electrical wiring subject to abrasion. The #5857 Farquar 1500 ton hydraulic press had an operator control panel with flexible sealtite conduit that was damaged and separated.