Violation Detail
Standard Cited: 19030019 C01 Abatement verification.
Inspection Nr: 1527275.015
Citation: 04001
Citation Type: Other
Abatement Date: 11/29/2021 7
Initial Penalty: $329.00
Current Penalty: $329.00
Issuance Date: 11/16/2021
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity:
Report ID: 0111500
Contest Date:
Final Order: 12/21/2021
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 11/16/2021 | $329.00 | 11/29/2021 | Other |
Text For Citation: 04 Item/Group: 001 Hazard:
29 CFR 1903.19(c)(1): Employer did not certify to OSHA, within 10 calendar days after the abatement date, that the cited violation had been abated: Location: 538 Bow Lane, Middletown, Connecticut Abatement certification and verification for Citation 001, Item 02 and Citation 003, Item 01 with a final order date of 10/1/2021 was not received within 10 calendar days ( by 10/8/2021) following the abatement due date (9/28/2021).