Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1037687.015
Citation: 04002
Citation Type: Other
Abatement Date: 10/02/2015 2
Initial Penalty: $1,100.00
Current Penalty: $1,100.00
Issuance Date: 07/31/2015
Nr Instances: 1
Nr Exposed: 14
Related Event Code (REC):
Gravity:
Report ID: 0523900
Contest Date:
Final Order: 08/25/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/25/2015 | $1,100.00 | 10/02/2015 | Other | |
Penalty | Z: Issued | 07/31/2015 | $1,100.00 | 08/28/2015 | Other |
Text For Citation: 04 Item/Group: 002 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: (a) Throughout the facility; The employer did not conduct periodic inspections of the energy control procedures and conduct a review with authorized employees to ensure there were no deficiencies.