Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 961178.015
Citation: 04003
Citation Type: Other
Abatement Date: 09/11/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/03/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0316400
Contest Date:
Final Order: 09/25/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/25/2014 | $0.00 | 09/11/2014 | Other | |
Penalty | Z: Issued | 09/03/2014 | $0.00 | 09/11/2014 | Other |
Text For Citation: 04 Item/Group: 003 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: (a) Sawmill: The main power panel/box in the sawmill was not marked or labeled to indicate its purpose, as determined on March 5, 2014. ABATEMENT CERTIFICATION IS REQUIRED FOR THIS ITEM