Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 961178.015
Citation: 04004
Citation Type: Other
Abatement Date: 09/15/2014 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/03/2014
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC):
Gravity:
Report ID: 0316400
Contest Date:
Final Order: 09/25/2014
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/25/2014 | $0.00 | 09/15/2014 | Other | |
Penalty | Z: Issued | 09/03/2014 | $0.00 | 09/15/2014 | Other |
Text For Citation: 04 Item/Group: 004 Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose: (a) Shop Area. Two sections of romex cable had been spliced together and the insulated conductors were not covered with an insulation equivalent to the outer insulation, as determined on or about March 5, 2014. ABATEMENT CERTIFICATION REQUIRED FOR THIS ITEM