Inspection Detail
Inspection: 1237410.015 - Energes Services Llc
Inspection Information - Office: Denver Area Office
Site Address:
Energes Services Llc
Wcr 13 & Wcr 32, E ? Mi, S ? Mi, W 0.2 Mi 40.210783, -104.932077
Mead, CO 80542
Mailing Address:
1328 East 18th Street, Greeley, CO 80631
Union Status: NonUnion
SIC:
NAICS: 213112/Support Activities for Oil and Gas Operations
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 10/25/2017
Emphasis: L:Oilgas
Case Closed: 05/14/2019
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1223029 | ||
Inspection | 1237560 | Yes | |
Inspection | 1237778 | Yes | |
Inspection | 1241352 | Yes | |
Inspection | 1238215 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 3 | 1 | 4 | |||
Current Violations | 3 | 1 | 4 | |||
Initial Penalty | $29,967 | $0 | $0 | $0 | $0 | $29,967 |
Current Penalty | $29,967 | $0 | $0 | $0 | $0 | $29,967 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19260020 B02 | 11/16/2017 | 03/15/2019 | $12,675 | $12,675 | $0 | 12/12/2017 | F - Formal Settlement | |
2. | 01002A | Serious | 19260407 B02 I | 11/16/2017 | 03/15/2019 | $12,675 | $12,675 | $0 | 12/12/2017 | F - Formal Settlement | |
3. | 01002B | Other | 19260651 G01 III | 11/16/2017 | 03/15/2019 | $0 | $0 | $0 | 12/12/2017 | F - Formal Settlement | |
4. | 01003A | Serious | 19260651 J02 | 11/16/2017 | $0 | $4,617 | $0 | 12/12/2017 | F - Formal Settlement | Citation has been deleted. | |
5. | 01003B | Serious | 19260651 K01 | 11/16/2017 | 03/15/2019 | $4,617 | $0 | $0 | 12/12/2017 | F - Formal Settlement | |
6. | 02001A | Other | 19101200 E01 | 11/16/2017 | 03/15/2019 | $0 | $0 | $0 | 12/12/2017 | F - Formal Settlement | |
7. | 02001B | Other | 19101200 E02 I | 11/16/2017 | 03/15/2019 | $0 | $0 | $0 | 12/12/2017 | F - Formal Settlement | |
8. | 02001C | Other | 19101200 G08 | 11/16/2017 | 03/15/2019 | $0 | $0 | $0 | 12/12/2017 | F - Formal Settlement |
Investigation Summary
At 3:15 p.m. on May 25, 2017, two employees were preparing hot plates to use during fusion of plastic piping. Other workers at the site were backfilling a trench. Other workers at the site were welding and using oxyacetylene torches to connect steel piping in a trench. The piping was connected to a crude oil tank that had been partially emptied, but not washed out or vented. Flammable vapors ignited and three crude oil tanks exploded. Flash fire spread to area of trench, resulting in 4th degree burns and killing one worker. Three workers sustained third degree burns and were hospitalized. Two workers sustained first and second degree burns, and were treated and released.
Keywords: Chemical, Combustible Liquid, Crude Oil, Explosion, Lockout/Tagout, Natural Gas, Trench
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1237410.015 | 32 | M | Fatality | Laborers, except construction |