Inspection Detail
Inspection: 1276530.015 - Hogrefe Auto Parts, Llc
Inspection Information - Office: Toledo Area Office
Site Address:
Hogrefe Auto Parts, Llc
690 E. Riverview Ave
Napoleon, OH 43545
Mailing Address:
690 E. Riverview Ave, Napoleon, OH 43545
Union Status: NonUnion
SIC:
NAICS: 423930/Recyclable Material Merchant Wholesalers
Inspection Type: Fat/Cat
Scope: Partial
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 11/09/2017
Emphasis:
Case Closed: 04/27/2023
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1283233 |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 10 | 1 | 11 | |||
Current Violations | 10 | 1 | 11 | |||
Initial Penalty | $75,016 | $0 | $0 | $319 | $0 | $75,335 |
Current Penalty | $75,016 | $0 | $0 | $319 | $0 | $75,335 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 5A0001 | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
2. | 01002 | Serious | 19100101 B | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
3. | 01003 | Serious | 19100252 A01 | 04/30/2018 | 05/16/2018 | $12,934 | $12,934 | $0 | 05/21/2018 | F - Formal Settlement | |
4. | 01004 | Serious | 19100252 A02 II | 04/30/2018 | 05/16/2018 | $12,934 | $12,934 | $0 | 05/21/2018 | F - Formal Settlement | |
5. | 01005 | Serious | 19100252 A02 III A | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
6. | 01006 | Serious | 19100252 A02 IV | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
7. | 01007 | Serious | 19100252 A02 XIII C | 04/30/2018 | 05/16/2018 | $12,934 | $12,934 | $0 | 05/21/2018 | F - Formal Settlement | |
8. | 01008A | Serious | 19100252 B02 I B | 04/30/2018 | 05/16/2018 | $12,934 | $12,934 | $0 | 05/21/2018 | F - Formal Settlement | |
9. | 01008B | Serious | 19100252 B03 | 04/30/2018 | 05/16/2018 | $0 | $0 | $0 | 05/21/2018 | F - Formal Settlement | |
10. | 01009 | Serious | 19101200 E01 | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
11. | 01010 | Serious | 19101200 H01 | 04/30/2018 | 05/16/2018 | $3,880 | $3,880 | $0 | 05/21/2018 | F - Formal Settlement | |
12. | 02001 | Other | 19030019 C01 | 02/20/2019 | 03/15/2019 | $319 | $319 | $0 | Z - Issued |
Investigation Summary
At approximately 11:00 a.m. On November 9, 2017, an employee was attempting to use a propane oxygen mixture to cut a catalytic converter off of a junkyard vehicle. The entire left side (drivers side) of the vehicle was lifted with a skidsteer so the employee could access the underside of the vehicle. As the employee was using a torch to cut, gasoline vapors began building up in a small area, and eventually caused an explosion, catching the employee and multiple surrounding vehicles on fire. The employee was found deceased nearby after the fire was extinguished.
Keywords: Acetylene Torch, Compressed Gas, Heat
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1276530.015 | 41 | M | Fatality | Not specified mechanics and repairers |