Inspection Detail
Inspection: 1301219.015 - Cabka North America Inc.
Inspection Information - Office: Saint Louis Area Office
Site Address:
Cabka North America Inc.
123 Byassee Drive
Hazelwood, MO 63042
Mailing Address:
123 Byassee Drive, Hazelwood, MO 63042
Union Status: NonUnion
SIC:
NAICS: 325211/Plastics Material and Resin Manufacturing
Inspection Type: Fat/Cat
Scope: Complete
Advanced Notice: N
Ownership: Private
Safety/Health: Safety
Close Conference: 03/13/2018
Emphasis: L:Elecgi, L:Repvehicle
Case Closed: 09/18/2018
Type | Activity Nr | Safety | Health |
---|---|---|---|
Accident | 1320730 | ||
Referral | 1320205 | Yes | |
Referral | 1316933 | Yes | |
Complaint | 1317491 | Yes |
Violations/Penalties | Serious | Willful | Repeat | Other | Unclass | Total |
---|---|---|---|---|---|---|
Initial Violations | 9 | 1 | 10 | |||
Current Violations | 6 | 4 | 10 | |||
Initial Penalty | $94,234 | $0 | $0 | $5,000 | $0 | $99,234 |
Current Penalty | $53,584 | $0 | $0 | $16,416 | $0 | $70,000 |
FTA Penalty | $0 | $0 | $0 | $0 | $0 | $0 |
# | Citation ID | Citaton Type | Standard Cited | Issuance Date | Abatement Due Date | Current Penalty | Initial Penalty | FTA Penalty | Contest | Latest Event | Note |
---|---|---|---|---|---|---|---|---|---|---|---|
1. | 01001 | Serious | 19100147 C06 I | 08/22/2018 | 09/18/2018 | $7,391 | $7,391 | $0 | I - Informal Settlement | ||
2. | 01002A | Serious | 19100132 A | 08/22/2018 | 09/18/2018 | $11,086 | $11,086 | $0 | I - Informal Settlement | ||
3. | 01002B | Serious | 19100132 D01 | 08/22/2018 | 09/18/2018 | $0 | $0 | $0 | I - Informal Settlement | ||
4. | 01003 | Serious | 19100212 A01 | 08/22/2018 | 09/18/2018 | $9,239 | $9,239 | $0 | I - Informal Settlement | ||
5. | 01004 | Other | 19100305 B02 I | 08/22/2018 | 09/18/2018 | $3,500 | $7,391 | $0 | I - Informal Settlement | ||
6. | 01005 | Other | 19100305 G02 III | 08/22/2018 | 09/18/2018 | $4,916 | $7,391 | $0 | I - Informal Settlement | ||
7. | 01006 | Serious | 19100332 A | 08/22/2018 | 09/18/2018 | $12,934 | $12,934 | $0 | I - Informal Settlement | ||
8. | 01007A | Serious | 19100333 C02 | 08/22/2018 | 09/18/2018 | $0 | $12,934 | $0 | I - Informal Settlement | Citation has been deleted. | |
9. | 01007B | Serious | 19100335 A01 I | 08/22/2018 | 09/18/2018 | $0 | $0 | $0 | I - Informal Settlement | ||
10. | 01008 | Serious | 19100335 A02 I | 08/22/2018 | 09/18/2018 | $12,934 | $12,934 | $0 | I - Informal Settlement | ||
11. | 01009 | Other | 19100335 B02 | 08/22/2018 | 09/18/2018 | $3,000 | $12,934 | $0 | I - Informal Settlement | ||
12. | 02001 | Other | 19040039 A02 | 08/22/2018 | $5,000 | $5,000 | $0 | I - Informal Settlement |
Investigation Summary
At 9:15 a.m. on March 8, 2018, a maintenance manager was working on a live breaker panel when an arc flash occurred, burning the employee. The employee suffered first, second, and third burns and was taken to hospital, where he later died.
Keywords: Arc Welding, Burn
# | Inspection | Age | Sex | Degree of Injury | Nature of Injury | Occupation |
---|---|---|---|---|---|---|
1 | 1301219.015 | 54 | M | Fatality | Machinery maintenance occupations |