« Previous Next »
TEXT VERSION OF SLIDE:
Title: Slide 37
Type: Image Slide
Content:
Unstable scaffold: Not fully planked, concrete blocks used as footing, 2 x 4 lumber used to "prop" the scaffold against the building, with #9 wire to hold the 2 x 4s in place, inadequate guardrails, etc.
[Includes an image of an improperly braced scaffold]